Concrete Pool Removal in Sydney

Has your concrete swimming pool become a burden? Are you missing your backyard? Make your yard a space your family can enjoy.​ Call Rapid Demolition to arrange the removal of your concrete pool.

GET A FAST FREE QUOTE NOW

    Concrete Pool Construction Types

    Concrete pools are built using different construction methods, each resulting in slightly different structural characteristics that affect the removal process. Identifying your pool’s construction type helps us create an efficient plan for your swimming pool demolition project.

    high angle view swimming pool by trees

    GUNITE POOLS

    Gunite is the most common concrete pool construction method in Australia. The process involves spraying a dry concrete mix through a hose using compressed air, with water added at the nozzle as the material is applied. The water quantity is carefully controlled to manage concrete consistency during application.

    Gunite creates a dense, durable pool shell when properly applied. The dry mix process allows for accurate thickness control and excellent adhesion to the steel rebar framework.

    part memorial complex fountain

    SHOTCRETE POOLS

    Shotcrete refers to wet concrete that’s pre-mixed with water before being shot through a hose onto the pool structure. This wet mix arrives at your property in a concrete truck barrel already fully mixed. Less common than gunite for residential pools, shotcrete delivers consistency in the concrete mix and can be applied efficiently.

    Both gunite and shotcrete pools use high-pressure nozzles to ensure dense compaction without air pockets.

    clear water swimming pool daytime

    CAST-IN-PLACE CONCRETE POOLS

    Cast-in-place concrete pools use traditional formwork and pouring methods rather than spray application. Forms are constructed around the pool perimeter, and concrete is poured directly into these moulds. This method is less common for residential pools but may be found in older installations or commercial settings.

    873606a8771c2a676aa0e18b086b70f7

    REINFORCED CONCRETE STRUCTURE

    All concrete pools feature steel rebar reinforcement throughout the walls and floor. This reinforced steel cage provides structural integrity and prevents cracking.

    During concrete pool demolition, this rebar must be cut and removed along with the concrete shell. The presence of reinforcement makes concrete pools significantly more labour-intensive to remove compared to fibreglass pools.

    Benefits of Concrete Pool Removal

    Some of the benefits of removing an unwanted concrete swimming pool, include:

    Group 386

    ELIMINATED MAINTENANCE COSTS

    Concrete pool demolition means no more expensive outlay for chemicals, electricity for pumps and heating, water replacement, equipment repairs, and professional servicing.

    Group 386

    RECLAIMED USABLE SPACE

    Swimming pool demolition leaves space for entertaining areas, vegetable gardens, children’s play equipment, or additional lawn for family activities. This reclaimed space often provides more daily enjoyment than an unused pool.​

    Group 386

    ENHANCED PROPERTY SAFETY

    Older concrete pools can be safety risks. Unused pools present drowning hazards, particularly for young children, elderly relatives, and pets. Pool removal eliminates these concerns.

    Group 386

    SIMPLIFIED PROPERTY MAINTENANCE

    Concrete pools require regular attention including water testing, chemical balancing and cleaning. Pool removal frees up weekends previously spent on pool care.

    Group 386

    INCREASED PROPERTY APPEAL

    Potential buyers often prefer properties without the maintenance responsibilities of pool ownership, so removing an old pool can broaden your buyer pool when selling your home.​

    Group 386

    IMPROVED LANDSCAPING OPPORTUNITIES

    Without a pool, the additional space allows for gardens, trees, and outdoor features that weren’t previously possible.​

    The Concrete Pool Removal Process

    We have developed a systematic approach to concrete pool demolition, guaranteeing safe, efficient work. Each step requires specialised equipment and experienced operators to manage the challenges of reinforced concrete structures.

    Group 343

    Permits and Planning

    Every project begins by obtaining all necessary demolition permits from your local council. We handle the entire permit application process on your behalf, ensuring full compliance with NSW regulations. This planning phase includes site assessment, access evaluation, and coordination of utility disconnections.

    Group 344

    Pool Draining and Utility Disconnection

    The pool must be completely drained according to local authority requirements before demolition begins. We use submersible pumps to remove water and direct drainage to appropriate areas. Licensed electricians disconnect all electrical connections, gas lines are capped by qualified professionals, and plumbing lines are cut and sealed.

    Group 345

    Accessory and Equipment Removal

    All pool equipment, including pumps, filters, heaters, and cleaning systems, is disconnected and removed. Surrounding features such as diving boards, ladders, handrails, and pool covers are also taken away. Any decking, coping, or paving that may restrict equipment access is removed to allow machinery movement.​

    Group 346

    Concrete Demolition

    We use excavators fitted with hydraulic hammer attachments to break through the thick concrete shell. Jackhammers are used for detailed and more precise work.

    As we demolish sections, we cut through steel rebar using specialised rebar cutters or cutting torches. The demolition progresses from the pool perimeter inward, breaking the structure into manageable pieces.​

    Group 347

    Debris Sorting and Removal

    All demolished materials, including concrete chunks and cut rebar, are sorted on-site. Concrete is recycled, with many facilities crushing it for reuse as aggregate material. This reduces landfill waste and can lower disposal costs. Steel rebar is collected separately for metal recycling.

    Group 348

    Backfilling the Excavation

    Once demolition is complete, we fill the cavity with suitable materials, such as clean fill dirt or gravel. Material is added in lifts of approximately 15cm (6 inches) at a time. This layered approach ensures proper compaction and prevents future settling.​

    Group 388

    Soil Compaction

    We use professional soil compactors to compress each layer to 90% to 95% compaction density. For larger projects or building sites, a soils engineer may oversee the compaction process to verify proper density is achieved. This thorough compaction prevents settling and creates a surface capable of supporting landscaping or outdoor structures.​

    Group 387

    Final Grading and Restoration

    We grade the surface to match the surrounding areas and ensure water drainage away from structures. A layer of quality topsoil is applied across the restored area. The site is left smooth, stable, and ready for immediate turfing, planting, or paving.

    Image 141

    Why Choose Rapid Demolition for Your Concrete Swimming Pool Demolition?

    Rapid Demolition has specialised experts for handling the challenges of reinforced concrete structures.​

    Group 389

    Specialised Concrete Demolition Experience

    Our team uses specialised techniques needed to break through thick concrete shells whilst managing steel rebar safely. This specialised knowledge prevents unnecessary complications and ensures efficient project completion.

    Group 355

    Professional Equipment Fleet

    We have the essential demolition equipment, including excavators with hydraulic hammers, skid steer loaders, jackhammers, rebar cutters, dump trucks, and soil compactors. Our investment in quality machinery equates to faster project completion and superior results.

    Group 354

    Comprehensive Service Management

    We run your project from start to finish, including permit applications, utility disconnections, demolition work, debris recycling and disposal, backfilling, compaction, and landscaping preparation. You won’t need to manage any part of the removal yourself.​

    Group 353

    Licensed and Fully Insured

    We’re fully licensed and compliant with all NSW safety regulations and WorkSafe NSW requirements.

    Group 357

    Efficient Project Timelines

    We understand that homeowners want to move forward with their landscaping plans, so our efficient processes and modern equipment ensure cost-effective and timely completion without unnecessary delays.

    Group 295

    Environmental Responsibility

    We recycle as much material as possible, crushing concrete for reuse as aggregate material while Steel rebar is separated and sent to metal recycling facilities. This reduces waste and often lowers project costs.​

    Group 352

    Transparent and Competitive Pricing

    Our free, no-obligation quotes include all project costs, and we never add additional fees added after work begins.​

    Group 297

    Proper Compaction Certification

    If future building is planned, we arrange for soil engineers to oversee and certify the compaction process to comply with building standards. Proper documentation protects your investment and future property plans.​

    Contact Rapid Demolition for Professional Concrete Pool Removal

    Are you ready to transform your backyard with professional concrete pool removal? Our experienced team will evaluate your specific pool construction type and size, discuss your requirements and timeline and answer all questions.

    Contact Rapid Demolition today for a free, no-obligation quote and comprehensive site assessment.