Concrete Pool Removal in Sydney
Has your concrete swimming pool become a burden? Are you missing your backyard? Make your yard a space your family can enjoy. Call Rapid Demolition to arrange the removal of your concrete pool.
GET A FAST FREE QUOTE NOW
Concrete Pool Construction Types
Concrete pools are built using different construction methods, each resulting in slightly different structural characteristics that affect the removal process. Identifying your pool’s construction type helps us create an efficient plan for your swimming pool demolition project.
GUNITE POOLS
Gunite is the most common concrete pool construction method in Australia. The process involves spraying a dry concrete mix through a hose using compressed air, with water added at the nozzle as the material is applied. The water quantity is carefully controlled to manage concrete consistency during application.
Gunite creates a dense, durable pool shell when properly applied. The dry mix process allows for accurate thickness control and excellent adhesion to the steel rebar framework.
SHOTCRETE POOLS
Shotcrete refers to wet concrete that’s pre-mixed with water before being shot through a hose onto the pool structure. This wet mix arrives at your property in a concrete truck barrel already fully mixed. Less common than gunite for residential pools, shotcrete delivers consistency in the concrete mix and can be applied efficiently.
Both gunite and shotcrete pools use high-pressure nozzles to ensure dense compaction without air pockets.
CAST-IN-PLACE CONCRETE POOLS
Cast-in-place concrete pools use traditional formwork and pouring methods rather than spray application. Forms are constructed around the pool perimeter, and concrete is poured directly into these moulds. This method is less common for residential pools but may be found in older installations or commercial settings.
REINFORCED CONCRETE STRUCTURE
All concrete pools feature steel rebar reinforcement throughout the walls and floor. This reinforced steel cage provides structural integrity and prevents cracking.
During concrete pool demolition, this rebar must be cut and removed along with the concrete shell. The presence of reinforcement makes concrete pools significantly more labour-intensive to remove compared to fibreglass pools.
Benefits of Concrete Pool Removal
Some of the benefits of removing an unwanted concrete swimming pool, include:
ELIMINATED MAINTENANCE COSTS
Concrete pool demolition means no more expensive outlay for chemicals, electricity for pumps and heating, water replacement, equipment repairs, and professional servicing.
RECLAIMED USABLE SPACE
Swimming pool demolition leaves space for entertaining areas, vegetable gardens, children’s play equipment, or additional lawn for family activities. This reclaimed space often provides more daily enjoyment than an unused pool.
ENHANCED PROPERTY SAFETY
Older concrete pools can be safety risks. Unused pools present drowning hazards, particularly for young children, elderly relatives, and pets. Pool removal eliminates these concerns.
SIMPLIFIED PROPERTY MAINTENANCE
Concrete pools require regular attention including water testing, chemical balancing and cleaning. Pool removal frees up weekends previously spent on pool care.
INCREASED PROPERTY APPEAL
Potential buyers often prefer properties without the maintenance responsibilities of pool ownership, so removing an old pool can broaden your buyer pool when selling your home.
IMPROVED LANDSCAPING OPPORTUNITIES
Without a pool, the additional space allows for gardens, trees, and outdoor features that weren’t previously possible.
The Concrete Pool Removal Process
We have developed a systematic approach to concrete pool demolition, guaranteeing safe, efficient work. Each step requires specialised equipment and experienced operators to manage the challenges of reinforced concrete structures.
Permits and Planning
Every project begins by obtaining all necessary demolition permits from your local council. We handle the entire permit application process on your behalf, ensuring full compliance with NSW regulations. This planning phase includes site assessment, access evaluation, and coordination of utility disconnections.
Pool Draining and Utility Disconnection
The pool must be completely drained according to local authority requirements before demolition begins. We use submersible pumps to remove water and direct drainage to appropriate areas. Licensed electricians disconnect all electrical connections, gas lines are capped by qualified professionals, and plumbing lines are cut and sealed.
Accessory and Equipment Removal
All pool equipment, including pumps, filters, heaters, and cleaning systems, is disconnected and removed. Surrounding features such as diving boards, ladders, handrails, and pool covers are also taken away. Any decking, coping, or paving that may restrict equipment access is removed to allow machinery movement.
Concrete Demolition
We use excavators fitted with hydraulic hammer attachments to break through the thick concrete shell. Jackhammers are used for detailed and more precise work.
As we demolish sections, we cut through steel rebar using specialised rebar cutters or cutting torches. The demolition progresses from the pool perimeter inward, breaking the structure into manageable pieces.
Debris Sorting and Removal
All demolished materials, including concrete chunks and cut rebar, are sorted on-site. Concrete is recycled, with many facilities crushing it for reuse as aggregate material. This reduces landfill waste and can lower disposal costs. Steel rebar is collected separately for metal recycling.
Backfilling the Excavation
Once demolition is complete, we fill the cavity with suitable materials, such as clean fill dirt or gravel. Material is added in lifts of approximately 15cm (6 inches) at a time. This layered approach ensures proper compaction and prevents future settling.
Soil Compaction
We use professional soil compactors to compress each layer to 90% to 95% compaction density. For larger projects or building sites, a soils engineer may oversee the compaction process to verify proper density is achieved. This thorough compaction prevents settling and creates a surface capable of supporting landscaping or outdoor structures.
Final Grading and Restoration
We grade the surface to match the surrounding areas and ensure water drainage away from structures. A layer of quality topsoil is applied across the restored area. The site is left smooth, stable, and ready for immediate turfing, planting, or paving.
Why Choose Rapid Demolition for Your Concrete Swimming Pool Demolition?
Rapid Demolition has specialised experts for handling the challenges of reinforced concrete structures.
Specialised Concrete Demolition Experience
Our team uses specialised techniques needed to break through thick concrete shells whilst managing steel rebar safely. This specialised knowledge prevents unnecessary complications and ensures efficient project completion.
Professional Equipment Fleet
We have the essential demolition equipment, including excavators with hydraulic hammers, skid steer loaders, jackhammers, rebar cutters, dump trucks, and soil compactors. Our investment in quality machinery equates to faster project completion and superior results.
Comprehensive Service Management
We run your project from start to finish, including permit applications, utility disconnections, demolition work, debris recycling and disposal, backfilling, compaction, and landscaping preparation. You won’t need to manage any part of the removal yourself.
Licensed and Fully Insured
We’re fully licensed and compliant with all NSW safety regulations and WorkSafe NSW requirements.
Efficient Project Timelines
We understand that homeowners want to move forward with their landscaping plans, so our efficient processes and modern equipment ensure cost-effective and timely completion without unnecessary delays.
Environmental Responsibility
We recycle as much material as possible, crushing concrete for reuse as aggregate material while Steel rebar is separated and sent to metal recycling facilities. This reduces waste and often lowers project costs.
Transparent and Competitive Pricing
Our free, no-obligation quotes include all project costs, and we never add additional fees added after work begins.
Proper Compaction Certification
If future building is planned, we arrange for soil engineers to oversee and certify the compaction process to comply with building standards. Proper documentation protects your investment and future property plans.
Contact Rapid Demolition for Professional Concrete Pool Removal
Are you ready to transform your backyard with professional concrete pool removal? Our experienced team will evaluate your specific pool construction type and size, discuss your requirements and timeline and answer all questions.
Contact Rapid Demolition today for a free, no-obligation quote and comprehensive site assessment.